09/03/2011
|
NOTICE: If you rely on the DDOTS Library for your protocol designs, please check it regularly for amendments that your IRB has approved. You can compare the version Date\Time stamp of the study design in the Library with your installed design for any given protocol. The DDOTS Version is simply a date stamp of when the study was last updated. So, the number: 20100212132245 means: yyyymmddhhmmss or in this case, February 12, 2010 at 1:22 PM and 45 Seconds.
CREDIT
1. The Master Schedule Report now allows filtering events per: "Only Completed Events and Unchecked-off events".
2. Staff Affiliations are now part of the Staff Information Report.
IDEA:
1. See CREDIT items: 1, 2
2. There is a new System Variable that toggles the Drug Transfer Acknowledgment notice in DARs to show or not show.
IRBANA:
1. See CREDIT items: 2
2. There is a new option for outputting merged Documents: Email. The system allows for loading email bodies with the merged message, and lets the user load in Subject, and addresses. It also allows for creating a PDF of the email that can be loaded automatically into the IRB Documents Library per each study.
|